Bloodroot with a rolling boil |
The Tired Hands 1st floor bar |
The day before was spent coating the 1st floor bar with a heavy duty two part epoxy. Overall I would say it was a successful experiment. The project yesterday for me was digging a trench for a french drain along side the building. The fun never ends...
No comments:
Post a Comment